Project Components
The Pwalugu Multi-Purpose Dam Project will comprise the following components:• A dam with maximum reservoir area of 260 km2 and full supply level of 165m
• A 60 MW power house with two (2) turbines
• A 20-metre-high weir with primary and secondary canals for a 25,000-hectare irrigation scheme
• 15km overhead transmission line
• A 50MW Solar Hybrid Plant